Integrated Forecasting Approach for Takt and Location-Based SchedulingSource: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012::page 04025199-1Author:Seppänen, Olli
DOI: 10.1061/JCEMD4.COENG-16877Publisher: American Society of Civil Engineers
Abstract: AbstractTakt production is a location-based planning and controlling method that makes schedules
more reliable and shortens project durations with no increase in resources by promoting
the better use of the workspace. Although several recent publications ...
|
Show full item record
| contributor author | Seppänen, Olli | |
| date accessioned | 2026-08-20T10:39:15Z | |
| date available | 2026-08-20T10:39:15Z | |
| date copyright | 2025/09/24 | |
| date issued | 2025 | |
| identifier other | JCEMD4.COENG-16877.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311081 | |
| description abstract | AbstractTakt production is a location-based planning and controlling method that makes schedules more reliable and shortens project durations with no increase in resources by promoting the better use of the workspace. Although several recent publications ... | |
| publisher | American Society of Civil Engineers | |
| title | Integrated Forecasting Approach for Takt and Location-Based Scheduling | |
| type | Journal Article | |
| journal volume | 151 | |
| journal issue | 12 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-16877 | |
| journal fristpage | 04025199-1 | |
| journal lastpage | 04025199-14 | |
| page | 14 | |
| tree | Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012 | |
| contenttype | Fulltext |