Show simple item record

contributor authorSeppänen, Olli
date accessioned2026-08-20T10:39:15Z
date available2026-08-20T10:39:15Z
date copyright2025/09/24
date issued2025
identifier otherJCEMD4.COENG-16877.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311081
description abstractAbstractTakt production is a location-based planning and controlling method that makes schedules more reliable and shortens project durations with no increase in resources by promoting the better use of the workspace. Although several recent publications ...
publisherAmerican Society of Civil Engineers
titleIntegrated Forecasting Approach for Takt and Location-Based Scheduling
typeJournal Article
journal volume151
journal issue12
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-16877
journal fristpage04025199-1
journal lastpage04025199-14
page14
treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record