| contributor author | Fangye Jiang | |
| contributor author | Yanming Lyu | |
| contributor author | Yupeng Zhang | |
| contributor author | Yiling Guo | |
| date accessioned | 2023-11-27T23:15:51Z | |
| date available | 2023-11-27T23:15:51Z | |
| date issued | 7/14/2023 12:00:00 AM | |
| date issued | 2023-07-14 | |
| identifier other | JCEMD4.COENG-13108.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4293427 | |
| description abstract | Public–private partnership (PPP) project risk management through risk-factor attention has been widely studied for a long time; however, it remains unknown whether the attention degree of risk indicators corresponds to their loss degrees. This study investigated the difference between risk-factor attention and losses in PPP projects by utilizing text mining, questionnaire survey, fuzzy comprehensive evaluation, and importance-performance analysis methods (IPA). The results show a surprising attention-loss phenomenon: some factors attract more attention but bring fewer losses; other factors attract less attention while causing more losses. The research findings provided valuable references not only for PPP project managers but also for further studies on the risk management of PPP projects. | |
| publisher | ASCE | |
| title | Research on the Differences between Risk-Factor Attention and Risk Losses in PPP Projects | |
| type | Journal Article | |
| journal volume | 149 | |
| journal issue | 9 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/JCEMD4.COENG-13108 | |
| journal fristpage | 04023090-1 | |
| journal lastpage | 04023090-12 | |
| page | 12 | |
| tree | Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 009 | |
| contenttype | Fulltext | |