Show simple item record

contributor authorFangye Jiang
contributor authorYanming Lyu
contributor authorYupeng Zhang
contributor authorYiling Guo
date accessioned2023-11-27T23:15:51Z
date available2023-11-27T23:15:51Z
date issued7/14/2023 12:00:00 AM
date issued2023-07-14
identifier otherJCEMD4.COENG-13108.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293427
description abstractPublic–private partnership (PPP) project risk management through risk-factor attention has been widely studied for a long time; however, it remains unknown whether the attention degree of risk indicators corresponds to their loss degrees. This study investigated the difference between risk-factor attention and losses in PPP projects by utilizing text mining, questionnaire survey, fuzzy comprehensive evaluation, and importance-performance analysis methods (IPA). The results show a surprising attention-loss phenomenon: some factors attract more attention but bring fewer losses; other factors attract less attention while causing more losses. The research findings provided valuable references not only for PPP project managers but also for further studies on the risk management of PPP projects.
publisherASCE
titleResearch on the Differences between Risk-Factor Attention and Risk Losses in PPP Projects
typeJournal Article
journal volume149
journal issue9
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-13108
journal fristpage04023090-1
journal lastpage04023090-12
page12
treeJournal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record