YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010::page 04022102
    Author:
    Jean-Paul Paquin
    ,
    Pierre-Paul Morin
    ,
    Annick Lambert
    ,
    Tamas Koplyay
    DOI: 10.1061/(ASCE)CO.1943-7862.0002361
    Publisher: ASCE
    Abstract: This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts.
    • Download: (422.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4288003
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJean-Paul Paquin
    contributor authorPierre-Paul Morin
    contributor authorAnnick Lambert
    contributor authorTamas Koplyay
    date accessioned2022-12-27T20:47:51Z
    date available2022-12-27T20:47:51Z
    date issued2022/10/01
    identifier other(ASCE)CO.1943-7862.0002361.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4288003
    description abstractThis paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts.
    publisherASCE
    titleAssessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure
    typeJournal Article
    journal volume148
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002361
    journal fristpage04022102
    journal lastpage04022102_11
    page11
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian