YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 003::page 05021001-1
    Author:
    Cynthia Brosque
    ,
    Gunnar Skeie
    ,
    Martin Fischer
    DOI: 10.1061/(ASCE)CO.1943-7862.0002002
    Publisher: ASCE
    Abstract: Robots have increased the safety, productivity, and quality of manufacturing. Recently, sensing, computing, and mapping technologies have started to enable the use of robots in unstructured environments like construction. As robotic construction methods are being prototyped and adopted on site, innovation leaders in construction must analyze the safety, productivity, quality, and cost impacts of the deployment of robots. The researchers gained access to engineering, planning, and production data for the first use of a concrete drilling robot on site. This paper compares the traditional way of drilling holes with the robotic way. Compared to manual drilling for installation hangers, the robot achieved a 10% time reduction, increased task ergonomics by cutting 98% of muscle strain work hours, and reduced rework from 5% to 3%. Our comparison pays particular attention to the three levers a project team has to influence project outcomes—the product, the organization, and the process—and found that decisions like implementing a building information model (BIM) at Level of Development (LOD) 400 facilitated the robot use. This study makes two contributions to the fields of construction robotics and project management: First, this research shares a careful analysis of the application of a drilling robot to offer insights into the applicability of robots on site. Second, this analysis suggests key elements and procedures of a framework to compare robotic and traditional construction methods. Future research should establish the generality of this analysis framework.
    • Download: (2.719Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4270976
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCynthia Brosque
    contributor authorGunnar Skeie
    contributor authorMartin Fischer
    date accessioned2022-02-01T00:08:15Z
    date available2022-02-01T00:08:15Z
    date issued3/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002002.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270976
    description abstractRobots have increased the safety, productivity, and quality of manufacturing. Recently, sensing, computing, and mapping technologies have started to enable the use of robots in unstructured environments like construction. As robotic construction methods are being prototyped and adopted on site, innovation leaders in construction must analyze the safety, productivity, quality, and cost impacts of the deployment of robots. The researchers gained access to engineering, planning, and production data for the first use of a concrete drilling robot on site. This paper compares the traditional way of drilling holes with the robotic way. Compared to manual drilling for installation hangers, the robot achieved a 10% time reduction, increased task ergonomics by cutting 98% of muscle strain work hours, and reduced rework from 5% to 3%. Our comparison pays particular attention to the three levers a project team has to influence project outcomes—the product, the organization, and the process—and found that decisions like implementing a building information model (BIM) at Level of Development (LOD) 400 facilitated the robot use. This study makes two contributions to the fields of construction robotics and project management: First, this research shares a careful analysis of the application of a drilling robot to offer insights into the applicability of robots on site. Second, this analysis suggests key elements and procedures of a framework to compare robotic and traditional construction methods. Future research should establish the generality of this analysis framework.
    publisherASCE
    titleComparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers
    typeJournal Paper
    journal volume147
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002002
    journal fristpage05021001-1
    journal lastpage05021001-16
    page16
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian