Show simple item record

contributor authorCynthia Brosque
contributor authorGunnar Skeie
contributor authorMartin Fischer
date accessioned2022-02-01T00:08:15Z
date available2022-02-01T00:08:15Z
date issued3/1/2021
identifier other%28ASCE%29CO.1943-7862.0002002.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270976
description abstractRobots have increased the safety, productivity, and quality of manufacturing. Recently, sensing, computing, and mapping technologies have started to enable the use of robots in unstructured environments like construction. As robotic construction methods are being prototyped and adopted on site, innovation leaders in construction must analyze the safety, productivity, quality, and cost impacts of the deployment of robots. The researchers gained access to engineering, planning, and production data for the first use of a concrete drilling robot on site. This paper compares the traditional way of drilling holes with the robotic way. Compared to manual drilling for installation hangers, the robot achieved a 10% time reduction, increased task ergonomics by cutting 98% of muscle strain work hours, and reduced rework from 5% to 3%. Our comparison pays particular attention to the three levers a project team has to influence project outcomes—the product, the organization, and the process—and found that decisions like implementing a building information model (BIM) at Level of Development (LOD) 400 facilitated the robot use. This study makes two contributions to the fields of construction robotics and project management: First, this research shares a careful analysis of the application of a drilling robot to offer insights into the applicability of robots on site. Second, this analysis suggests key elements and procedures of a framework to compare robotic and traditional construction methods. Future research should establish the generality of this analysis framework.
publisherASCE
titleComparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers
typeJournal Paper
journal volume147
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0002002
journal fristpage05021001-1
journal lastpage05021001-16
page16
treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record