YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance of Resource-Constrained Scheduling Heuristics

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    Author:
    Diana M. Franco-Duran
    ,
    Jesús M. de la Garza
    DOI: 10.1061/(ASCE)CO.1943-7862.0001804
    Publisher: ASCE
    Abstract: Over the years, the study of resource-constrained scheduling heuristics has focused on testing different sets of priority rules without paying attention to the conditions under which each heuristic produces better results. Although some authors have recommended the use of specific heuristics over any other rule, these recommendations are general and do not encompass all possible project characteristics in terms of resources and network topology. Without a guidance system, schedulers must try several combinations of rules until they find one that compares favorably (shortest duration) with the results of the other priority rules. This study proposes a new tiebreaker (priority number) that enhances the performance of an existing heuristic and classifies the heuristics’ performance based on specific project characteristics. The results show that, as a tiebreaker of the late finish rule, the priority number leads to obtain schedules with lower deviations from the critical path method (CPM) duration and a higher number of shortest schedules than with traditional tiebreakers. The proposed classification system indicates the two heuristics with the best performance for specific resource network characteristics. This classification will help practitioners to decide which heuristic applies when mitigating the resource supply–demand problem given the project characteristics.
    • Download: (1.519Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Performance of Resource-Constrained Scheduling Heuristics

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4265178
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDiana M. Franco-Duran
    contributor authorJesús M. de la Garza
    date accessioned2022-01-30T19:22:33Z
    date available2022-01-30T19:22:33Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001804.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265178
    description abstractOver the years, the study of resource-constrained scheduling heuristics has focused on testing different sets of priority rules without paying attention to the conditions under which each heuristic produces better results. Although some authors have recommended the use of specific heuristics over any other rule, these recommendations are general and do not encompass all possible project characteristics in terms of resources and network topology. Without a guidance system, schedulers must try several combinations of rules until they find one that compares favorably (shortest duration) with the results of the other priority rules. This study proposes a new tiebreaker (priority number) that enhances the performance of an existing heuristic and classifies the heuristics’ performance based on specific project characteristics. The results show that, as a tiebreaker of the late finish rule, the priority number leads to obtain schedules with lower deviations from the critical path method (CPM) duration and a higher number of shortest schedules than with traditional tiebreakers. The proposed classification system indicates the two heuristics with the best performance for specific resource network characteristics. This classification will help practitioners to decide which heuristic applies when mitigating the resource supply–demand problem given the project characteristics.
    publisherASCE
    titlePerformance of Resource-Constrained Scheduling Heuristics
    typeJournal Paper
    journal volume146
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001804
    page04020026
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian