YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Computerized Life‐Cycle Cost Systems in the Army

    Source: Journal of Computing in Civil Engineering:;1989:;Volume ( 003 ):;issue: 001
    Author:
    Edgar Samuel Neely, Jr.
    ,
    Robert Neathammer
    DOI: 10.1061/(ASCE)0887-3801(1989)3:1(93)
    Publisher: American Society of Civil Engineers
    Abstract: The U.S. Army Construction Engineering Research Laboratory, Champaign, Illinois, has developed several sets of calculation methods for determining life cycle costs of facilities. Two calculation methods have been implemented in a relational database language on a national computer system and on a basic DOS personal computer. Four calculation methods have been implemented in a DOS environment for an embellished personal computer. All calculation methods can be applied by any organization (cities, universities, corporations) for resource prediction. The calculation methods are currently being applied by selected installations in Germany and the United States. Benefits and operation of the system are described in this paper. The main features of the system are presented as applicable to all elements within the Army.
    • Download: (817.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Computerized Life‐Cycle Cost Systems in the Army

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42627
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorEdgar Samuel Neely, Jr.
    contributor authorRobert Neathammer
    date accessioned2017-05-08T21:12:12Z
    date available2017-05-08T21:12:12Z
    date copyrightJanuary 1989
    date issued1989
    identifier other%28asce%290887-3801%281989%293%3A1%2893%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42627
    description abstractThe U.S. Army Construction Engineering Research Laboratory, Champaign, Illinois, has developed several sets of calculation methods for determining life cycle costs of facilities. Two calculation methods have been implemented in a relational database language on a national computer system and on a basic DOS personal computer. Four calculation methods have been implemented in a DOS environment for an embellished personal computer. All calculation methods can be applied by any organization (cities, universities, corporations) for resource prediction. The calculation methods are currently being applied by selected installations in Germany and the United States. Benefits and operation of the system are described in this paper. The main features of the system are presented as applicable to all elements within the Army.
    publisherAmerican Society of Civil Engineers
    titleComputerized Life‐Cycle Cost Systems in the Army
    typeJournal Paper
    journal volume3
    journal issue1
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)0887-3801(1989)3:1(93)
    treeJournal of Computing in Civil Engineering:;1989:;Volume ( 003 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian