YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Annual Performance Estimation of a Multireservoir System Including a Pumped Storage Plant for the Mean Hydrological Year

    Source: Journal of Energy Engineering:;2017:;Volume ( 143 ):;issue: 006
    Author:
    Eliza Isabela Tică
    ,
    Bogdan Popa
    ,
    Radu Popa
    DOI: 10.1061/(ASCE)EY.1943-7897.0000489
    Publisher: American Society of Civil Engineers
    Abstract: An existing Romanian hydro system (two reservoirs/peak hydropower plants), where the addition of a pumped storage plant with a weekly emptying/filling cycle was planned, was selected as a case study. For the main upstream reservoir/hydropower plant, an operational policy with a monthly time step was derived using a stochastic dynamic programming model. The optimal weekly scheduling problem of the whole system was solved by a genetic algorithm-based model. The monetary income maximization, by 2014 market energy prices for produced/consumed energy, was chosen as the objective function; any gain from ancillary services was ignored. An original methodology for coupling the monthly and weekly time-step results was used to obtain the annual performance estimation within the mean hydrological year conditions. At that level, the inclusion of the pumped storage plant would lead to a gain to nearly double the annual performance of the existing hydro system.
    • Download: (712.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Annual Performance Estimation of a Multireservoir System Including a Pumped Storage Plant for the Mean Hydrological Year

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4245787
    Collections
    • Journal of Energy Engineering

    Show full item record

    contributor authorEliza Isabela Tică
    contributor authorBogdan Popa
    contributor authorRadu Popa
    date accessioned2017-12-30T13:06:51Z
    date available2017-12-30T13:06:51Z
    date issued2017
    identifier other%28ASCE%29EY.1943-7897.0000489.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245787
    description abstractAn existing Romanian hydro system (two reservoirs/peak hydropower plants), where the addition of a pumped storage plant with a weekly emptying/filling cycle was planned, was selected as a case study. For the main upstream reservoir/hydropower plant, an operational policy with a monthly time step was derived using a stochastic dynamic programming model. The optimal weekly scheduling problem of the whole system was solved by a genetic algorithm-based model. The monetary income maximization, by 2014 market energy prices for produced/consumed energy, was chosen as the objective function; any gain from ancillary services was ignored. An original methodology for coupling the monthly and weekly time-step results was used to obtain the annual performance estimation within the mean hydrological year conditions. At that level, the inclusion of the pumped storage plant would lead to a gain to nearly double the annual performance of the existing hydro system.
    publisherAmerican Society of Civil Engineers
    titleAnnual Performance Estimation of a Multireservoir System Including a Pumped Storage Plant for the Mean Hydrological Year
    typeJournal Paper
    journal volume143
    journal issue6
    journal titleJournal of Energy Engineering
    identifier doi10.1061/(ASCE)EY.1943-7897.0000489
    page04017058
    treeJournal of Energy Engineering:;2017:;Volume ( 143 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian