contributor authorEliza Isabela Tică
contributor authorBogdan Popa
contributor authorRadu Popa
date accessioned2017-12-30T13:06:51Z
date available2017-12-30T13:06:51Z
date issued2017
identifier other%28ASCE%29EY.1943-7897.0000489.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245787
description abstractAn existing Romanian hydro system (two reservoirs/peak hydropower plants), where the addition of a pumped storage plant with a weekly emptying/filling cycle was planned, was selected as a case study. For the main upstream reservoir/hydropower plant, an operational policy with a monthly time step was derived using a stochastic dynamic programming model. The optimal weekly scheduling problem of the whole system was solved by a genetic algorithm-based model. The monetary income maximization, by 2014 market energy prices for produced/consumed energy, was chosen as the objective function; any gain from ancillary services was ignored. An original methodology for coupling the monthly and weekly time-step results was used to obtain the annual performance estimation within the mean hydrological year conditions. At that level, the inclusion of the pumped storage plant would lead to a gain to nearly double the annual performance of the existing hydro system.
publisherAmerican Society of Civil Engineers
titleAnnual Performance Estimation of a Multireservoir System Including a Pumped Storage Plant for the Mean Hydrological Year
typeJournal Paper
journal volume143
journal issue6
journal titleJournal of Energy Engineering
identifier doi10.1061/(ASCE)EY.1943-7897.0000489
page04017058
treeJournal of Energy Engineering:;2017:;Volume ( 143 ):;issue: 006
contenttypeFulltext