Factors Affecting Rework Costs in ConstructionSource: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008DOI: 10.1061/(ASCE)CO.1943-7862.0001324Publisher: American Society of Civil Engineers
Abstract: Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the effects of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationships among contributing factors and to develop a model for rework prediction. Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contributed to the regression model. Project type, type of organization, type of contract, and original contract duration (OCD), which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties, to reduce impacts on project cost and schedule, and, thus, to improve productivity.
|
Show full item record
| contributor author | Nuria Forcada | |
| contributor author | Marta Gangolells | |
| contributor author | Miquel Casals | |
| contributor author | Marcel Macarulla | |
| date accessioned | 2017-12-16T09:18:22Z | |
| date available | 2017-12-16T09:18:22Z | |
| date issued | 2017 | |
| identifier other | %28ASCE%29CO.1943-7862.0001324.pdf | |
| identifier uri | http://138.201.223.254:8080/yetl1/handle/yetl/4241198 | |
| description abstract | Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the effects of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationships among contributing factors and to develop a model for rework prediction. Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contributed to the regression model. Project type, type of organization, type of contract, and original contract duration (OCD), which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties, to reduce impacts on project cost and schedule, and, thus, to improve productivity. | |
| publisher | American Society of Civil Engineers | |
| title | Factors Affecting Rework Costs in Construction | |
| type | Journal Paper | |
| journal volume | 143 | |
| journal issue | 8 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)CO.1943-7862.0001324 | |
| tree | Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008 | |
| contenttype | Fulltext |