contributor authorNuria Forcada
contributor authorMarta Gangolells
contributor authorMiquel Casals
contributor authorMarcel Macarulla
date accessioned2017-12-16T09:18:22Z
date available2017-12-16T09:18:22Z
date issued2017
identifier other%28ASCE%29CO.1943-7862.0001324.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241198
description abstractRework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the effects of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationships among contributing factors and to develop a model for rework prediction. Interestingly, the rework prediction model showed that only the original contract value (OCV) and the project location in relation to the company’s headquarters contributed to the regression model. Project type, type of organization, type of contract, and original contract duration (OCD), which represents the magnitude and complexity of a project, were represented by the OCV. This model for rework prediction based on original project conditions enables strategies to be put in place prior to the start of construction, to minimize uncertainties, to reduce impacts on project cost and schedule, and, thus, to improve productivity.
publisherAmerican Society of Civil Engineers
titleFactors Affecting Rework Costs in Construction
typeJournal Paper
journal volume143
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001324
treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
contenttypeFulltext