YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Continuous Line Bucket Lifting Versus Pipe Lifting

    Source: Journal of Offshore Mechanics and Arctic Engineering:;2017:;volume( 139 ):;issue: 005::page 51704
    Author:
    Ma, Wenbin
    ,
    Schott, Dingena
    ,
    Lodewijks, Gabriël
    DOI: 10.1115/1.4036375
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: In the literature, the continuous line bucket (CLB) lifting system and the pipe lifting system (PLS), as two typical mineral lifting methods in deep sea mining (DSM) systems, have been discussed since the 1960s. The purpose of this paper is to determine an appropriate lifting method for deep sea mining systems at different working conditions. The determination is based on the comparison of the analysis results of the two typical lifting methods considering the technology performance and the profitability. The analysis is based on a numerical calculation performed in a matlab environment. This paper shows the comparison of the results of the CLB system and PLS in terms of the lifting efficiency, the energy consumption, and the profitability. The research reported in this paper can be utilized to select a proper lifting method for a DSM project depending on its specific criteria analysis.
    • Download: (3.952Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Continuous Line Bucket Lifting Versus Pipe Lifting

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4235492
    Collections
    • Journal of Offshore Mechanics and Arctic Engineering

    Show full item record

    contributor authorMa, Wenbin
    contributor authorSchott, Dingena
    contributor authorLodewijks, Gabriël
    date accessioned2017-11-25T07:18:55Z
    date available2017-11-25T07:18:55Z
    date copyright2017/25/5
    date issued2017
    identifier issn0892-7219
    identifier otheromae_139_05_051704.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4235492
    description abstractIn the literature, the continuous line bucket (CLB) lifting system and the pipe lifting system (PLS), as two typical mineral lifting methods in deep sea mining (DSM) systems, have been discussed since the 1960s. The purpose of this paper is to determine an appropriate lifting method for deep sea mining systems at different working conditions. The determination is based on the comparison of the analysis results of the two typical lifting methods considering the technology performance and the profitability. The analysis is based on a numerical calculation performed in a matlab environment. This paper shows the comparison of the results of the CLB system and PLS in terms of the lifting efficiency, the energy consumption, and the profitability. The research reported in this paper can be utilized to select a proper lifting method for a DSM project depending on its specific criteria analysis.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleContinuous Line Bucket Lifting Versus Pipe Lifting
    typeJournal Paper
    journal volume139
    journal issue5
    journal titleJournal of Offshore Mechanics and Arctic Engineering
    identifier doi10.1115/1.4036375
    journal fristpage51704
    journal lastpage051704-9
    treeJournal of Offshore Mechanics and Arctic Engineering:;2017:;volume( 139 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian