Show simple item record

contributor authorMa, Wenbin
contributor authorSchott, Dingena
contributor authorLodewijks, Gabriël
date accessioned2017-11-25T07:18:55Z
date available2017-11-25T07:18:55Z
date copyright2017/25/5
date issued2017
identifier issn0892-7219
identifier otheromae_139_05_051704.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4235492
description abstractIn the literature, the continuous line bucket (CLB) lifting system and the pipe lifting system (PLS), as two typical mineral lifting methods in deep sea mining (DSM) systems, have been discussed since the 1960s. The purpose of this paper is to determine an appropriate lifting method for deep sea mining systems at different working conditions. The determination is based on the comparison of the analysis results of the two typical lifting methods considering the technology performance and the profitability. The analysis is based on a numerical calculation performed in a matlab environment. This paper shows the comparison of the results of the CLB system and PLS in terms of the lifting efficiency, the energy consumption, and the profitability. The research reported in this paper can be utilized to select a proper lifting method for a DSM project depending on its specific criteria analysis.
publisherThe American Society of Mechanical Engineers (ASME)
titleContinuous Line Bucket Lifting Versus Pipe Lifting
typeJournal Paper
journal volume139
journal issue5
journal titleJournal of Offshore Mechanics and Arctic Engineering
identifier doi10.1115/1.4036375
journal fristpage51704
journal lastpage051704-9
treeJournal of Offshore Mechanics and Arctic Engineering:;2017:;volume( 139 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record