| contributor author | Prashant Kapila | |
| contributor author | Chris Hendrickson | |
| date accessioned | 2017-05-08T21:11:43Z | |
| date available | 2017-05-08T21:11:43Z | |
| date copyright | October 2001 | |
| date issued | 2001 | |
| identifier other | %28asce%290742-597x%282001%2917%3A4%28186%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/42323 | |
| description abstract | This paper identifies the financial risk factors associated with international construction ventures from an integrated perspective. It examines the most effective mitigation measures adopted by construction professionals in managing these risks for their construction projects and suggests other means of risk aversion. A case study of forward exchange contracts versus borrowing strategies is presented. The paper is an attempt to present strategies to minimize foreign exchange risk and to better manage foreign exchange dealings. | |
| publisher | American Society of Civil Engineers | |
| title | Exchange Rate Risk Management in International Construction Ventures | |
| type | Journal Paper | |
| journal volume | 17 | |
| journal issue | 4 | |
| journal title | Journal of Management in Engineering | |
| identifier doi | 10.1061/(ASCE)0742-597X(2001)17:4(186) | |
| tree | Journal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 004 | |
| contenttype | Fulltext | |