Show simple item record

contributor authorPrashant Kapila
contributor authorChris Hendrickson
date accessioned2017-05-08T21:11:43Z
date available2017-05-08T21:11:43Z
date copyrightOctober 2001
date issued2001
identifier other%28asce%290742-597x%282001%2917%3A4%28186%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42323
description abstractThis paper identifies the financial risk factors associated with international construction ventures from an integrated perspective. It examines the most effective mitigation measures adopted by construction professionals in managing these risks for their construction projects and suggests other means of risk aversion. A case study of forward exchange contracts versus borrowing strategies is presented. The paper is an attempt to present strategies to minimize foreign exchange risk and to better manage foreign exchange dealings.
publisherAmerican Society of Civil Engineers
titleExchange Rate Risk Management in International Construction Ventures
typeJournal Paper
journal volume17
journal issue4
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)0742-597X(2001)17:4(186)
treeJournal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record