YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Economics of Time Management: Case Study at NB Power

    Source: Journal of Management in Engineering:;1997:;Volume ( 013 ):;issue: 002
    Author:
    Marc J. Demers
    ,
    Joyendu Bhadury
    ,
    Mohammed A. Rahim
    DOI: 10.1061/(ASCE)0742-597X(1997)13:2(57)
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes a project undertaken at the New Brunswick Power Corporation (NB Power) the utility corporation of the Canadian province, in a cost-cutting effort through the use of improved time management. The focus of the project was to investigate if the time estimates in use at the corporation for work completion were accurate. We begin with a description of how the data was gathered from two sets of time measurement and was validated—the first set represents the current times in use at NB Power while the second set represents estimates obtained from experts. This is followed by a discussion of the methodology. Finally, this paper summarizes the conclusions and recommendations that are made to serve as the basis for improvement of performance and quality measurement.
    • Download: (728.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Economics of Time Management: Case Study at NB Power

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42002
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMarc J. Demers
    contributor authorJoyendu Bhadury
    contributor authorMohammed A. Rahim
    date accessioned2017-05-08T21:11:14Z
    date available2017-05-08T21:11:14Z
    date copyrightMarch 1997
    date issued1997
    identifier other%28asce%290742-597x%281997%2913%3A2%2857%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42002
    description abstractThis paper describes a project undertaken at the New Brunswick Power Corporation (NB Power) the utility corporation of the Canadian province, in a cost-cutting effort through the use of improved time management. The focus of the project was to investigate if the time estimates in use at the corporation for work completion were accurate. We begin with a description of how the data was gathered from two sets of time measurement and was validated—the first set represents the current times in use at NB Power while the second set represents estimates obtained from experts. This is followed by a discussion of the methodology. Finally, this paper summarizes the conclusions and recommendations that are made to serve as the basis for improvement of performance and quality measurement.
    publisherAmerican Society of Civil Engineers
    titleEconomics of Time Management: Case Study at NB Power
    typeJournal Paper
    journal volume13
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1997)13:2(57)
    treeJournal of Management in Engineering:;1997:;Volume ( 013 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian