YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Decommissioning Cost Functions in the Gulf of Mexico

    Source: Journal of Waterway, Port, Coastal, and Ocean Engineering:;2003:;Volume ( 129 ):;issue: 006
    Author:
    Mark J. Kaiser
    ,
    Allan G. Pulsipher
    ,
    Robert C. Byrd
    DOI: 10.1061/(ASCE)0733-950X(2003)129:6(286)
    Publisher: American Society of Civil Engineers
    Abstract: The cost to decommission offshore structures in the Gulf of Mexico is examined based on 60 projects managed by Twachtman, Synder, & Byrd, Inc., over the years 1991–2001. Cost functions are established for each stage of decommissioning, including well plugging and abandonment, structure preparation, pipeline abandonment, structure removal, and site clearance and verification. The component cost of decommissioning is analyzed statistically, and regression models are empirically derived using various descriptor variables. A candid discussion of the limitations of analysis is also presented. This paper represents the first empirical study to construct decommissioning cost functions for the Gulf of Mexico region based on actual job data.
    • Download: (210.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Decommissioning Cost Functions in the Gulf of Mexico

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41503
    Collections
    • Journal of Waterway, Port, Coastal, and Ocean Engineering

    Show full item record

    contributor authorMark J. Kaiser
    contributor authorAllan G. Pulsipher
    contributor authorRobert C. Byrd
    date accessioned2017-05-08T21:10:27Z
    date available2017-05-08T21:10:27Z
    date copyrightNovember 2003
    date issued2003
    identifier other%28asce%290733-950x%282003%29129%3A6%28286%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41503
    description abstractThe cost to decommission offshore structures in the Gulf of Mexico is examined based on 60 projects managed by Twachtman, Synder, & Byrd, Inc., over the years 1991–2001. Cost functions are established for each stage of decommissioning, including well plugging and abandonment, structure preparation, pipeline abandonment, structure removal, and site clearance and verification. The component cost of decommissioning is analyzed statistically, and regression models are empirically derived using various descriptor variables. A candid discussion of the limitations of analysis is also presented. This paper represents the first empirical study to construct decommissioning cost functions for the Gulf of Mexico region based on actual job data.
    publisherAmerican Society of Civil Engineers
    titleDecommissioning Cost Functions in the Gulf of Mexico
    typeJournal Paper
    journal volume129
    journal issue6
    journal titleJournal of Waterway, Port, Coastal, and Ocean Engineering
    identifier doi10.1061/(ASCE)0733-950X(2003)129:6(286)
    treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;2003:;Volume ( 129 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian