YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cleaning and Lining Versus Parallel Mains

    Source: Journal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 001
    Author:
    Thomas M. Walski
    DOI: 10.1061/(ASCE)0733-9496(1985)111:1(43)
    Publisher: American Society of Civil Engineers
    Abstract: Cleaning and lining a water main is often an economical alternative to installing a parallel main or spending large amounts of money on energy to overcome large head losses due to friction. This paper first presents methods for selecting the length of pipe to be cleaned and lined, and the diameter and length of the parallel pipe to be installed to meet a target head loss. Then, the costs of each approach are compared. In general, the decision to clean and line a main depends mostly on the head loss in the main, at the design flow rate.
    • Download: (511.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Cleaning and Lining Versus Parallel Mains

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/38718
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorThomas M. Walski
    date accessioned2017-05-08T21:06:07Z
    date available2017-05-08T21:06:07Z
    date copyrightJanuary 1985
    date issued1985
    identifier other%28asce%290733-9496%281985%29111%3A1%2843%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38718
    description abstractCleaning and lining a water main is often an economical alternative to installing a parallel main or spending large amounts of money on energy to overcome large head losses due to friction. This paper first presents methods for selecting the length of pipe to be cleaned and lined, and the diameter and length of the parallel pipe to be installed to meet a target head loss. Then, the costs of each approach are compared. In general, the decision to clean and line a main depends mostly on the head loss in the main, at the design flow rate.
    publisherAmerican Society of Civil Engineers
    titleCleaning and Lining Versus Parallel Mains
    typeJournal Paper
    journal volume111
    journal issue1
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1985)111:1(43)
    treeJournal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian