description abstractCleaning and lining a water main is often an economical alternative to installing a parallel main or spending large amounts of money on energy to overcome large head losses due to friction. This paper first presents methods for selecting the length of pipe to be cleaned and lined, and the diameter and length of the parallel pipe to be installed to meet a target head loss. Then, the costs of each approach are compared. In general, the decision to clean and line a main depends mostly on the head loss in the main, at the design flow rate.
publisherAmerican Society of Civil Engineers
titleCleaning and Lining Versus Parallel Mains
typeJournal Paper
journal volume111
journal issue1
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1985)111:1(43)
treeJournal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record