| contributor author | Gunther Greulich | |
| contributor author | Wayne H. Valentine | |
| contributor author | R. R. Chamard | |
| date accessioned | 2017-05-08T21:01:22Z | |
| date available | 2017-05-08T21:01:22Z | |
| date copyright | May 1994 | |
| date issued | 1994 | |
| identifier other | %28asce%290733-9453%281994%29120%3A2%2852%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/35720 | |
| description abstract | Surveying engineering is an essential ingredient to the assurance of quality in a constructed project. This paper addresses the responsibilities and tasks required prior to and during the constructed project. Project concept, planning, design, and the construction phase of a project in each phase does need special surveying concepts and specifications. Specific survey requirements are defined and detailed for each phase. The need for peer reviews in establishing engineering survey requirements vary by the type of survey needed during the work phase. A construction project is not completed until proper postconstruction surveys and documentation is complete. The paper details project minimum requirements and their long‐range importance in the life of a completed project. | |
| publisher | American Society of Civil Engineers | |
| title | Quality in Constructed Project: Surveying Engineering | |
| type | Journal Paper | |
| journal volume | 120 | |
| journal issue | 2 | |
| journal title | Journal of Surveying Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9453(1994)120:2(52) | |
| tree | Journal of Surveying Engineering:;1994:;Volume ( 120 ):;issue: 002 | |
| contenttype | Fulltext | |