Show simple item record

contributor authorGunther Greulich
contributor authorWayne H. Valentine
contributor authorR. R. Chamard
date accessioned2017-05-08T21:01:22Z
date available2017-05-08T21:01:22Z
date copyrightMay 1994
date issued1994
identifier other%28asce%290733-9453%281994%29120%3A2%2852%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35720
description abstractSurveying engineering is an essential ingredient to the assurance of quality in a constructed project. This paper addresses the responsibilities and tasks required prior to and during the constructed project. Project concept, planning, design, and the construction phase of a project in each phase does need special surveying concepts and specifications. Specific survey requirements are defined and detailed for each phase. The need for peer reviews in establishing engineering survey requirements vary by the type of survey needed during the work phase. A construction project is not completed until proper postconstruction surveys and documentation is complete. The paper details project minimum requirements and their long‐range importance in the life of a completed project.
publisherAmerican Society of Civil Engineers
titleQuality in Constructed Project: Surveying Engineering
typeJournal Paper
journal volume120
journal issue2
journal titleJournal of Surveying Engineering
identifier doi10.1061/(ASCE)0733-9453(1994)120:2(52)
treeJournal of Surveying Engineering:;1994:;Volume ( 120 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record