YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Resource Sharing in Linear Construction

    Source: Journal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
    Author:
    Srilal Perera
    DOI: 10.1061/(ASCE)0733-9364(1983)109:1(102)
    Publisher: American Society of Civil Engineers
    Abstract: In the method developed, the conventional method of allocating resources are not used. Instead, resource‐hour units are employed. This enables to allocate resources precisely and the analysis becomes realistic unlike any other method. The method uses linear programming to determine the maximum rate of construction and the resource requirements in various activities. Sharing of resources which are available in limited quantities and balanced trades are all catered for in this development. The economics of using additional resources, working overtime and the optimal usage of all resources are the more important aspects of this paper. The step by step process of introducing additional resources and overtime ease the decision making process considerably. The method also helps to determine whether it is more economical to invest in additional resources or introduce work on overtime. If there is no proper method to compute resource requirements, a considerable waste in resource utilization would result. If resources are under utilized, even by a very small quantity, a considerably large delay of time would incur.
    • Download: (460.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Resource Sharing in Linear Construction

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/30174
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSrilal Perera
    date accessioned2017-05-08T20:52:42Z
    date available2017-05-08T20:52:42Z
    date copyrightMarch 1983
    date issued1983
    identifier other%28asce%290733-9364%281983%29109%3A1%28102%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/30174
    description abstractIn the method developed, the conventional method of allocating resources are not used. Instead, resource‐hour units are employed. This enables to allocate resources precisely and the analysis becomes realistic unlike any other method. The method uses linear programming to determine the maximum rate of construction and the resource requirements in various activities. Sharing of resources which are available in limited quantities and balanced trades are all catered for in this development. The economics of using additional resources, working overtime and the optimal usage of all resources are the more important aspects of this paper. The step by step process of introducing additional resources and overtime ease the decision making process considerably. The method also helps to determine whether it is more economical to invest in additional resources or introduce work on overtime. If there is no proper method to compute resource requirements, a considerable waste in resource utilization would result. If resources are under utilized, even by a very small quantity, a considerably large delay of time would incur.
    publisherAmerican Society of Civil Engineers
    titleResource Sharing in Linear Construction
    typeJournal Paper
    journal volume109
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1983)109:1(102)
    treeJournal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian