Show simple item record

contributor authorSrilal Perera
date accessioned2017-05-08T20:52:42Z
date available2017-05-08T20:52:42Z
date copyrightMarch 1983
date issued1983
identifier other%28asce%290733-9364%281983%29109%3A1%28102%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/30174
description abstractIn the method developed, the conventional method of allocating resources are not used. Instead, resource‐hour units are employed. This enables to allocate resources precisely and the analysis becomes realistic unlike any other method. The method uses linear programming to determine the maximum rate of construction and the resource requirements in various activities. Sharing of resources which are available in limited quantities and balanced trades are all catered for in this development. The economics of using additional resources, working overtime and the optimal usage of all resources are the more important aspects of this paper. The step by step process of introducing additional resources and overtime ease the decision making process considerably. The method also helps to determine whether it is more economical to invest in additional resources or introduce work on overtime. If there is no proper method to compute resource requirements, a considerable waste in resource utilization would result. If resources are under utilized, even by a very small quantity, a considerably large delay of time would incur.
publisherAmerican Society of Civil Engineers
titleResource Sharing in Linear Construction
typeJournal Paper
journal volume109
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1983)109:1(102)
treeJournal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
contenttypeFulltext