YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contingent Use of Negotiators’ Tactics in Construction Dispute Negotiation

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 006
    Author:
    Sai On Cheung
    ,
    Pui Ting Chow
    ,
    Tak Wing Yiu
    DOI: 10.1061/(ASCE)0733-9364(2009)135:6(466)
    Publisher: American Society of Civil Engineers
    Abstract: In the course of negotiation, negotiators’ tactics should be responsive to the situational factors. This is commonly described as the contingent use of negotiators’ tactics. This study examines this concept in construction dispute negotiation and has three stages of work. Stage 1 develops taxonomies of the three construction dispute negotiation dimensions: dispute sources, negotiators’ tactics, and negotiation outcomes by exploratory factor analysis. A structural equation modeling is also used to confirm the taxonomies. Stage 2 examines the contingent use of negotiators’ tactics on outcomes respective to the dispute sources through the use of moderated multiple regression (MMR). Stage 3 discusses the findings. The dispute source, “
    • Download: (391.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Contingent Use of Negotiators’ Tactics in Construction Dispute Negotiation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/29331
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSai On Cheung
    contributor authorPui Ting Chow
    contributor authorTak Wing Yiu
    date accessioned2017-05-08T20:51:15Z
    date available2017-05-08T20:51:15Z
    date copyrightJune 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A6%28466%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29331
    description abstractIn the course of negotiation, negotiators’ tactics should be responsive to the situational factors. This is commonly described as the contingent use of negotiators’ tactics. This study examines this concept in construction dispute negotiation and has three stages of work. Stage 1 develops taxonomies of the three construction dispute negotiation dimensions: dispute sources, negotiators’ tactics, and negotiation outcomes by exploratory factor analysis. A structural equation modeling is also used to confirm the taxonomies. Stage 2 examines the contingent use of negotiators’ tactics on outcomes respective to the dispute sources through the use of moderated multiple regression (MMR). Stage 3 discusses the findings. The dispute source, “
    publisherAmerican Society of Civil Engineers
    titleContingent Use of Negotiators’ Tactics in Construction Dispute Negotiation
    typeJournal Paper
    journal volume135
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:6(466)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian