YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Irrigation and Drainage Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Irrigation Scheduling. I: Integer Programming Approach

    Source: Journal of Irrigation and Drainage Engineering:;2004:;Volume ( 130 ):;issue: 001
    Author:
    Tonny T. de Vries
    ,
    Arif A. Anwar
    DOI: 10.1061/(ASCE)0733-9437(2004)130:1(9)
    Publisher: American Society of Civil Engineers
    Abstract: This paper shows how a sequential irrigation schedule for a tertiary unit can be interpreted as a single machine scheduling problem with earliness, tardiness, and a common deadline. An integer program solution is presented for this irrigation scheduling problem. Two different models are presented to reflect different management options at the tertiary level. The first model allows jobs to be scheduled noncontiguously. In the second model only contiguous jobs are allowed. The second model has three submodels reflecting the various ways in which contiguous jobs can be scheduled over a fixed interval. Earlier work in determining unit costs of earliness/tardiness is reviewed and an alternative improved method is suggested. The models presented in this paper are applied to a tertiary unit with 16 users, both as a single interval and multi-interval irrigation scheduling problem. An alternative integer program is also presented which although computationally more efficient can only be used for single period scheduling problems. The models developed in this paper can be used to solve small scheduling problems and also to calibrate the heuristics as presented in the companion paper.
    • Download: (129.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Irrigation Scheduling. I: Integer Programming Approach

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/28235
    Collections
    • Journal of Irrigation and Drainage Engineering

    Show full item record

    contributor authorTonny T. de Vries
    contributor authorArif A. Anwar
    date accessioned2017-05-08T20:49:24Z
    date available2017-05-08T20:49:24Z
    date copyrightFebruary 2004
    date issued2004
    identifier other%28asce%290733-9437%282004%29130%3A1%289%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28235
    description abstractThis paper shows how a sequential irrigation schedule for a tertiary unit can be interpreted as a single machine scheduling problem with earliness, tardiness, and a common deadline. An integer program solution is presented for this irrigation scheduling problem. Two different models are presented to reflect different management options at the tertiary level. The first model allows jobs to be scheduled noncontiguously. In the second model only contiguous jobs are allowed. The second model has three submodels reflecting the various ways in which contiguous jobs can be scheduled over a fixed interval. Earlier work in determining unit costs of earliness/tardiness is reviewed and an alternative improved method is suggested. The models presented in this paper are applied to a tertiary unit with 16 users, both as a single interval and multi-interval irrigation scheduling problem. An alternative integer program is also presented which although computationally more efficient can only be used for single period scheduling problems. The models developed in this paper can be used to solve small scheduling problems and also to calibrate the heuristics as presented in the companion paper.
    publisherAmerican Society of Civil Engineers
    titleIrrigation Scheduling. I: Integer Programming Approach
    typeJournal Paper
    journal volume130
    journal issue1
    journal titleJournal of Irrigation and Drainage Engineering
    identifier doi10.1061/(ASCE)0733-9437(2004)130:1(9)
    treeJournal of Irrigation and Drainage Engineering:;2004:;Volume ( 130 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian