Show simple item record

contributor authorTonny T. de Vries
contributor authorArif A. Anwar
date accessioned2017-05-08T20:49:24Z
date available2017-05-08T20:49:24Z
date copyrightFebruary 2004
date issued2004
identifier other%28asce%290733-9437%282004%29130%3A1%289%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28235
description abstractThis paper shows how a sequential irrigation schedule for a tertiary unit can be interpreted as a single machine scheduling problem with earliness, tardiness, and a common deadline. An integer program solution is presented for this irrigation scheduling problem. Two different models are presented to reflect different management options at the tertiary level. The first model allows jobs to be scheduled noncontiguously. In the second model only contiguous jobs are allowed. The second model has three submodels reflecting the various ways in which contiguous jobs can be scheduled over a fixed interval. Earlier work in determining unit costs of earliness/tardiness is reviewed and an alternative improved method is suggested. The models presented in this paper are applied to a tertiary unit with 16 users, both as a single interval and multi-interval irrigation scheduling problem. An alternative integer program is also presented which although computationally more efficient can only be used for single period scheduling problems. The models developed in this paper can be used to solve small scheduling problems and also to calibrate the heuristics as presented in the companion paper.
publisherAmerican Society of Civil Engineers
titleIrrigation Scheduling. I: Integer Programming Approach
typeJournal Paper
journal volume130
journal issue1
journal titleJournal of Irrigation and Drainage Engineering
identifier doi10.1061/(ASCE)0733-9437(2004)130:1(9)
treeJournal of Irrigation and Drainage Engineering:;2004:;Volume ( 130 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record