YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    Author:
    Shahram Mohamad Karimi
    ,
    Seyed Jamshid Mousavi
    ,
    Ali Kaveh
    ,
    Abbas Afshar
    DOI: 10.1061/(ASCE)0733-9364(2007)133:2(181)
    Publisher: American Society of Civil Engineers
    Abstract: Existing linear programming (LP) models of earthwork allocations in roadway construction assume that unit cost coefficients of earthwork activities and borrow pits/disposal sites capacities are certain and deterministic numbers. However in real-world problems there are naturally some uncertainties inherited in these values, which make it difficult to represent a single value as the candidate of entire possible values. This paper presents a fuzzy linear programming (FLP) model of earthwork allocations based on the fact of assuming unit cost coefficients and borrow pits/disposal sites capacities as fuzzy numbers while minimizing total earth-moving cost as an objective function. A method based on
    • Download: (155.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Fuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/26931
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorShahram Mohamad Karimi
    contributor authorSeyed Jamshid Mousavi
    contributor authorAli Kaveh
    contributor authorAbbas Afshar
    date accessioned2017-05-08T20:46:50Z
    date available2017-05-08T20:46:50Z
    date copyrightFebruary 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A2%28181%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26931
    description abstractExisting linear programming (LP) models of earthwork allocations in roadway construction assume that unit cost coefficients of earthwork activities and borrow pits/disposal sites capacities are certain and deterministic numbers. However in real-world problems there are naturally some uncertainties inherited in these values, which make it difficult to represent a single value as the candidate of entire possible values. This paper presents a fuzzy linear programming (FLP) model of earthwork allocations based on the fact of assuming unit cost coefficients and borrow pits/disposal sites capacities as fuzzy numbers while minimizing total earth-moving cost as an objective function. A method based on
    publisherAmerican Society of Civil Engineers
    titleFuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters
    typeJournal Paper
    journal volume133
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:2(181)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian