contributor authorShahram Mohamad Karimi
contributor authorSeyed Jamshid Mousavi
contributor authorAli Kaveh
contributor authorAbbas Afshar
date accessioned2017-05-08T20:46:50Z
date available2017-05-08T20:46:50Z
date copyrightFebruary 2007
date issued2007
identifier other%28asce%290733-9364%282007%29133%3A2%28181%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26931
description abstractExisting linear programming (LP) models of earthwork allocations in roadway construction assume that unit cost coefficients of earthwork activities and borrow pits/disposal sites capacities are certain and deterministic numbers. However in real-world problems there are naturally some uncertainties inherited in these values, which make it difficult to represent a single value as the candidate of entire possible values. This paper presents a fuzzy linear programming (FLP) model of earthwork allocations based on the fact of assuming unit cost coefficients and borrow pits/disposal sites capacities as fuzzy numbers while minimizing total earth-moving cost as an objective function. A method based on
publisherAmerican Society of Civil Engineers
titleFuzzy Optimization Model for Earthwork Allocations with Imprecise Parameters
typeJournal Paper
journal volume133
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2007)133:2(181)
treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 002
contenttypeFulltext