YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Critical Path Method with Multiple Calendars

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 003
    Author:
    Kyunghwan Kim
    ,
    Jesús M. de la Garza
    DOI: 10.1061/(ASCE)0733-9364(2005)131:3(330)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the critical path method forward and backward passes with multiple calendars. Multiple calendars are required in many construction projects to effectively represent various project conditions such as work properties, resource availabilities, weather conditions, etc. For this reason, major project management software packages such as
    • Download: (4.223Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Critical Path Method with Multiple Calendars

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/23698
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKyunghwan Kim
    contributor authorJesús M. de la Garza
    date accessioned2017-05-08T20:41:34Z
    date available2017-05-08T20:41:34Z
    date copyrightMarch 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A3%28330%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23698
    description abstractThis paper presents the critical path method forward and backward passes with multiple calendars. Multiple calendars are required in many construction projects to effectively represent various project conditions such as work properties, resource availabilities, weather conditions, etc. For this reason, major project management software packages such as
    publisherAmerican Society of Civil Engineers
    titleCritical Path Method with Multiple Calendars
    typeJournal Paper
    journal volume131
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:3(330)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian