| contributor author | Brenda McCabe | |
| contributor author | Simaan AbouRizk | |
| contributor author | Jim Gavin | |
| date accessioned | 2017-05-08T20:34:11Z | |
| date available | 2017-05-08T20:34:11Z | |
| date copyright | February 2002 | |
| date issued | 2002 | |
| identifier other | %28asce%290733-9364%282002%29128%3A1%2885%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/19854 | |
| description abstract | The cost of quality assurance programs in asphalt road construction is high in part because of the need for daily testing. This paper demonstrates the methodology used to investigate the timing of sampling and its effect on the quality assurance program. Fourteen lots over two highway paving projects were tested twice: during construction on a daily basis, and after construction was complete. Three quality measures were compared, namely asphalt content, degree of compaction, and aggregate gradation. The test data during construction were obtained from two sources: the consultant’s quality assurance, and the contractor’s quality control. One-way ANOVA tests and | |
| publisher | American Society of Civil Engineers | |
| title | Time of Sampling Strategies for Asphalt Pavement Quality Assurance | |
| type | Journal Paper | |
| journal volume | 128 | |
| journal issue | 1 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2002)128:1(85) | |
| tree | Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001 | |
| contenttype | Fulltext | |