YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time of Sampling Strategies for Asphalt Pavement Quality Assurance

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    Author:
    Brenda McCabe
    ,
    Simaan AbouRizk
    ,
    Jim Gavin
    DOI: 10.1061/(ASCE)0733-9364(2002)128:1(85)
    Publisher: American Society of Civil Engineers
    Abstract: The cost of quality assurance programs in asphalt road construction is high in part because of the need for daily testing. This paper demonstrates the methodology used to investigate the timing of sampling and its effect on the quality assurance program. Fourteen lots over two highway paving projects were tested twice: during construction on a daily basis, and after construction was complete. Three quality measures were compared, namely asphalt content, degree of compaction, and aggregate gradation. The test data during construction were obtained from two sources: the consultant’s quality assurance, and the contractor’s quality control. One-way ANOVA tests and
    • Download: (52.43Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Time of Sampling Strategies for Asphalt Pavement Quality Assurance

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/19854
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBrenda McCabe
    contributor authorSimaan AbouRizk
    contributor authorJim Gavin
    date accessioned2017-05-08T20:34:11Z
    date available2017-05-08T20:34:11Z
    date copyrightFebruary 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A1%2885%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19854
    description abstractThe cost of quality assurance programs in asphalt road construction is high in part because of the need for daily testing. This paper demonstrates the methodology used to investigate the timing of sampling and its effect on the quality assurance program. Fourteen lots over two highway paving projects were tested twice: during construction on a daily basis, and after construction was complete. Three quality measures were compared, namely asphalt content, degree of compaction, and aggregate gradation. The test data during construction were obtained from two sources: the consultant’s quality assurance, and the contractor’s quality control. One-way ANOVA tests and
    publisherAmerican Society of Civil Engineers
    titleTime of Sampling Strategies for Asphalt Pavement Quality Assurance
    typeJournal Paper
    journal volume128
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:1(85)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian