description abstractThe cost of quality assurance programs in asphalt road construction is high in part because of the need for daily testing. This paper demonstrates the methodology used to investigate the timing of sampling and its effect on the quality assurance program. Fourteen lots over two highway paving projects were tested twice: during construction on a daily basis, and after construction was complete. Three quality measures were compared, namely asphalt content, degree of compaction, and aggregate gradation. The test data during construction were obtained from two sources: the consultant’s quality assurance, and the contractor’s quality control. One-way ANOVA tests and
publisherAmerican Society of Civil Engineers
titleTime of Sampling Strategies for Asphalt Pavement Quality Assurance
typeJournal Paper
journal volume128
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2002)128:1(85)
treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record