Journal of Legal Affairs and Dispute Resolution in Engineering and Construction: Recent submissions
Now showing items 641-660 of 799
-
Special Issue on Construction Dispute Resolution
(American Society of Civil Engineers, 2011) -
Call for Papers: Special Issue on Construction Dispute Resolution
(American Society of Civil Engineers, 2010) -
Proper Risk Allocation during Construction: Differing Site Conditions
(American Society of Civil Engineers, 2014)Differing site conditions are encountered on site when the actual conditions are materially different from those included in the contract documents (Type I) or from those reasonably expected by the project team given the ... -
Hazel Beh Retires from the Editorial Board
(American Society of Civil Engineers, 2011) -
Call for Papers: Special Issue on Alternative Dispute Resolution for the Engineering and Construction Industry
(American Society of Civil Engineers, 2011) -
From Hemlock to Hard-Drive
(American Society of Civil Engineers, 2009) -
Judicial Reviews of Public Administrators in Awarding Contracts
(American Society of Civil Engineers, 2009) -
Contractor Predictably Loses Notice Argument
(American Society of Civil Engineers, 2012) -
Limitation of Liability Clause Violates Anti-Indemnity Statute
(American Society of Civil Engineers, 2009) -
Proposed Reform for Singapore’s 2004 Building and Construction Industry Security of Payment Act
(American Society of Civil Engineers, 2015)This paper discusses Singapore’s Building and Construction Industry Security of Payment Act and an area of delay in the resolution of dispute under the Act. Prior to the Act, there was no regulation to ensure prompt and ... -
Dispute Resolution Strategy Selection
(American Society of Civil Engineers, 2015)Disputes inevitably happen in construction projects. Consequently, dispute resolution strategies—such as litigation, arbitration, mediation, dispute advisor boards, and negotiation—are all widely practiced. This paper aims ... -
Review of Detailed Schedules in Building Construction
(American Society of Civil Engineers, 2014)Detailed schedules are essential in the development of project baselines; they are needed for tracking and progress reporting, as well as for the administration of construction disputes. Thus, it is necessary to ensure the ... -
Difficulties of Contracts without Provisional Language
(American Society of Civil Engineers, 2013) -
A Creative Proposal for Dispute Systems Design for Construction Projects Employing BIM
(American Society of Civil Engineers, 2013)Building information modeling (BIM) causes a fundamental change in the way participants in a construction project interact with each other, requiring new and significant levels of collaboration, information sharing, and ... -
Biddability, Constructability, Operability, and Environmental Checklist: Potential Role in Reducing Conflicts, Claims, and Disputes
(American Society of Civil Engineers, 2014)Conflicts, claims, and disputes can be considered unavoidable consequences of the construction process. The United States Army Corps of Engineers (USACE) created a checklist to ensure that all proposed government projects ... -
Highway Embankment Contract Specifications
(American Society of Civil Engineers, 2014)This four-year project was extremely successful and well executed, even though a number of changed conditions developed during the project. Of these changed conditions, only one resulted in a claim that is discussed herein. ... -
Hong Kong’s First Competition Law: Impact on Construction Contracting
(American Society of Civil Engineers, 2014)After years of consultation and debate, Hong Kong finally enacted its first-ever cross-sector competition law. The Competition Ordinance (the Ordinance) was enacted on 14 June 2012, and implementation of the provisions is ... -
Project Benchmarking: Tool for Mitigating Conflicts, Claims, and Disputes through Improved Performance
(American Society of Civil Engineers, 2014)The construction industry significantly contributes to the U.S. economy. However, this important industry is negatively affected with many challenges including safety issues, design errors, delay, and changes. To this end, ... -
Concurrent Delays in Construction: International Legal Perspective
(American Society of Civil Engineers, 2014)The term “concurrent delays” describes the situation when more than one delay occurs simultaneously, either of which would alone delay the overall project. The responsibility of concurrent delays is usually attributable ... -
Conflicting Side of Building Information Modeling Implementation in the Construction Industry
(American Society of Civil Engineers, 2014)Building information modeling (BIM) has changed the face of the construction industry as it has affected not only the nature of interactions between the multiple stakeholders involved in projects, but also the framework ...