YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Dispute Resolution Strategy Selection

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 003
    Author:
    Thomas Haugen
    ,
    Amarjit Singh
    DOI: 10.1061/(ASCE)LA.1943-4170.0000160
    Publisher: American Society of Civil Engineers
    Abstract: Disputes inevitably happen in construction projects. Consequently, dispute resolution strategies—such as litigation, arbitration, mediation, dispute advisor boards, and negotiation—are all widely practiced. This paper aims to highlight the occasions when parties involved in a construction dispute should utilize mediation or arbitration after failing to reach an agreement through discussion and negotiation. Therefore, a set of selection criteria is necessary when deciding on which method of alternative dispute resolution (ADR) to use. In addition, the response of each method toward these selection criteria must be known. Moreover, the disputant must make an informed decision on how to weigh each selection criterion. However, in order to make an informed decision on which dispute resolution strategy to use, the position of the individual parties must be ascertained beforehand. For this reason, this paper discusses how the market position of a company can dictate what form of ADR is the most beneficial. Further, the relationship between the involved parties is important when deciding on a method of ADR, so this paper also discusses whether or not parties envision working together in future and how this factor affects the choice of a dispute resolution strategy. The last factor one must consider is the source of the dispute; however, because there are a vast number of definitions for specific sources of construction disputes, this paper analyzes how these affect the weighting of the selection criteria and uses pairwise matrix analysis and the Analytic Hierarchy Process to arrive at conclusions. A stepwise methodology is presented. After considering all relevant impacting factors, the disputant can systematically identify an appropriate dispute resolution strategy rather than solely rely on subjective decisions. Essentially, the methodology developed feeds assigned weights and scores into the authors’ developed matrix to provide a systematic framework for the professional to choose suitable dispute resolution techniques. This article uses findings from a multi-attribute utility model for dispute resolution strategy selection, and simulates six hypothetical—but real-world—scenarios to illustrate applications.
    • Download: (1.867Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Dispute Resolution Strategy Selection

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/72695
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorThomas Haugen
    contributor authorAmarjit Singh
    date accessioned2017-05-08T22:10:02Z
    date available2017-05-08T22:10:02Z
    date copyrightAugust 2015
    date issued2015
    identifier other36747551.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72695
    description abstractDisputes inevitably happen in construction projects. Consequently, dispute resolution strategies—such as litigation, arbitration, mediation, dispute advisor boards, and negotiation—are all widely practiced. This paper aims to highlight the occasions when parties involved in a construction dispute should utilize mediation or arbitration after failing to reach an agreement through discussion and negotiation. Therefore, a set of selection criteria is necessary when deciding on which method of alternative dispute resolution (ADR) to use. In addition, the response of each method toward these selection criteria must be known. Moreover, the disputant must make an informed decision on how to weigh each selection criterion. However, in order to make an informed decision on which dispute resolution strategy to use, the position of the individual parties must be ascertained beforehand. For this reason, this paper discusses how the market position of a company can dictate what form of ADR is the most beneficial. Further, the relationship between the involved parties is important when deciding on a method of ADR, so this paper also discusses whether or not parties envision working together in future and how this factor affects the choice of a dispute resolution strategy. The last factor one must consider is the source of the dispute; however, because there are a vast number of definitions for specific sources of construction disputes, this paper analyzes how these affect the weighting of the selection criteria and uses pairwise matrix analysis and the Analytic Hierarchy Process to arrive at conclusions. A stepwise methodology is presented. After considering all relevant impacting factors, the disputant can systematically identify an appropriate dispute resolution strategy rather than solely rely on subjective decisions. Essentially, the methodology developed feeds assigned weights and scores into the authors’ developed matrix to provide a systematic framework for the professional to choose suitable dispute resolution techniques. This article uses findings from a multi-attribute utility model for dispute resolution strategy selection, and simulates six hypothetical—but real-world—scenarios to illustrate applications.
    publisherAmerican Society of Civil Engineers
    titleDispute Resolution Strategy Selection
    typeJournal Paper
    journal volume7
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000160
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian