Field Testing and Adjusting of Hydraulic Turbine-Generator to Improve System RegulationSource: Journal of Engineering for Gas Turbines and Power:;1961:;volume( 083 ):;issue: 001::page 53Author:H. M. Stone
DOI: 10.1115/1.3673130Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: This paper presents some of the results and methods of extensive hydro prime-mover governor tests conducted at the Big Creek Hydro System of the author’s company. Each governor response was improved by making co-ordinated governor adjustments. Frequency-response curves and dead band X-Y charts are included to show the improvement obtained. Frequency dead band and the governor transient response time were improved as much as 50 per cent. A good share of the credit for the results and improvements obtained is due to the use of adequate test equipment. As described elsewhere, the Mobile Dynamics Laboratory for Studying Generating Plant Controls and Governors was designed and used for extensive preliminary tests. Later, a small compact test rig, described in this paper, was assembled and used for the routine testing and adjusting of governors.
keyword(s): Turbogenerators , Testing , Governors , Transients (Dynamics) , Power stations , Testing equipment , Frequency response AND Dynamics (Mechanics) ,
|
Show full item record
| contributor author | H. M. Stone | |
| date accessioned | 2017-05-09T01:20:06Z | |
| date available | 2017-05-09T01:20:06Z | |
| date copyright | January, 1961 | |
| date issued | 1961 | |
| identifier issn | 1528-8919 | |
| identifier other | JETPEZ-26612#53_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/158611 | |
| description abstract | This paper presents some of the results and methods of extensive hydro prime-mover governor tests conducted at the Big Creek Hydro System of the author’s company. Each governor response was improved by making co-ordinated governor adjustments. Frequency-response curves and dead band X-Y charts are included to show the improvement obtained. Frequency dead band and the governor transient response time were improved as much as 50 per cent. A good share of the credit for the results and improvements obtained is due to the use of adequate test equipment. As described elsewhere, the Mobile Dynamics Laboratory for Studying Generating Plant Controls and Governors was designed and used for extensive preliminary tests. Later, a small compact test rig, described in this paper, was assembled and used for the routine testing and adjusting of governors. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Field Testing and Adjusting of Hydraulic Turbine-Generator to Improve System Regulation | |
| type | Journal Paper | |
| journal volume | 83 | |
| journal issue | 1 | |
| journal title | Journal of Engineering for Gas Turbines and Power | |
| identifier doi | 10.1115/1.3673130 | |
| journal fristpage | 53 | |
| journal lastpage | 59 | |
| identifier eissn | 0742-4795 | |
| keywords | Turbogenerators | |
| keywords | Testing | |
| keywords | Governors | |
| keywords | Transients (Dynamics) | |
| keywords | Power stations | |
| keywords | Testing equipment | |
| keywords | Frequency response AND Dynamics (Mechanics) | |
| tree | Journal of Engineering for Gas Turbines and Power:;1961:;volume( 083 ):;issue: 001 | |
| contenttype | Fulltext |