description abstractThis paper presents some of the results and methods of extensive hydro prime-mover governor tests conducted at the Big Creek Hydro System of the author’s company. Each governor response was improved by making co-ordinated governor adjustments. Frequency-response curves and dead band X-Y charts are included to show the improvement obtained. Frequency dead band and the governor transient response time were improved as much as 50 per cent. A good share of the credit for the results and improvements obtained is due to the use of adequate test equipment. As described elsewhere, the Mobile Dynamics Laboratory for Studying Generating Plant Controls and Governors was designed and used for extensive preliminary tests. Later, a small compact test rig, described in this paper, was assembled and used for the routine testing and adjusting of governors.
publisherThe American Society of Mechanical Engineers (ASME)
titleField Testing and Adjusting of Hydraulic Turbine-Generator to Improve System Regulation
typeJournal Paper
journal volume83
journal issue1
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.3673130
journal fristpage53
journal lastpage59
identifier eissn0742-4795
keywordsTurbogenerators
keywordsTesting
keywordsGovernors
keywordsTransients (Dynamics)
keywordsPower stations
keywordsTesting equipment
keywordsFrequency response AND Dynamics (Mechanics)
treeJournal of Engineering for Gas Turbines and Power:;1961:;volume( 083 ):;issue: 001