Reliability of Sampling Inspection Schemes Applied to Replacement Steam GeneratorsSource: Journal of Pressure Vessel Technology:;2007:;volume( 129 ):;issue: 001::page 109DOI: 10.1115/1.2389027Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: The basis for determining the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after no defective tubes have been detected in the randomly selected inspection sample is proposed. A Bayesian estimation is used to obtain closed-form solutions for uniform, triangular, and binomial prior densities describing the number of failed tubes in steam generators. It is shown that the particular way of selecting the random inspection sample (e.g., one sample from both SG, one sample from each SG, etc.) does not affect the results of the inspection and also the information obtained about the state of the uninspected tubing, as long as the inspected steam generators belong to the same population. Numerical examples further demonstrate two possible states of the knowledge existing before the inspection of the tubing. First, virtually no knowledge about the state of the steam generator tubing before the inspection is modeled using uniform and triangular prior densities. It is shown that the knowledge about the uninspected part of the tubing strongly depends on the size of the sample inspected. Further, even small inspection samples may significantly improve our knowledge about the uninspected part. On the other hand, rather strong belief on the state of the tubing prior to the inspection is modeled using binomial prior density. In this case, the knowledge about the uninspected part of the tubing is virtually independent on the size of the sample. Furthermore, it is shown qualitatively and quantitatively that such inspection brings no additional knowledge on the uninspected part of the tubing.
keyword(s): Inspection , Boilers , Probability AND Sampling (Acoustical engineering) ,
|
Collections
Show full item record
| contributor author | Guy Roussel | |
| contributor author | Leon Cizelj | |
| date accessioned | 2017-05-09T00:25:35Z | |
| date available | 2017-05-09T00:25:35Z | |
| date copyright | February, 2007 | |
| date issued | 2007 | |
| identifier issn | 0094-9930 | |
| identifier other | JPVTAS-28476#109_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/136744 | |
| description abstract | The basis for determining the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after no defective tubes have been detected in the randomly selected inspection sample is proposed. A Bayesian estimation is used to obtain closed-form solutions for uniform, triangular, and binomial prior densities describing the number of failed tubes in steam generators. It is shown that the particular way of selecting the random inspection sample (e.g., one sample from both SG, one sample from each SG, etc.) does not affect the results of the inspection and also the information obtained about the state of the uninspected tubing, as long as the inspected steam generators belong to the same population. Numerical examples further demonstrate two possible states of the knowledge existing before the inspection of the tubing. First, virtually no knowledge about the state of the steam generator tubing before the inspection is modeled using uniform and triangular prior densities. It is shown that the knowledge about the uninspected part of the tubing strongly depends on the size of the sample inspected. Further, even small inspection samples may significantly improve our knowledge about the uninspected part. On the other hand, rather strong belief on the state of the tubing prior to the inspection is modeled using binomial prior density. In this case, the knowledge about the uninspected part of the tubing is virtually independent on the size of the sample. Furthermore, it is shown qualitatively and quantitatively that such inspection brings no additional knowledge on the uninspected part of the tubing. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Reliability of Sampling Inspection Schemes Applied to Replacement Steam Generators | |
| type | Journal Paper | |
| journal volume | 129 | |
| journal issue | 1 | |
| journal title | Journal of Pressure Vessel Technology | |
| identifier doi | 10.1115/1.2389027 | |
| journal fristpage | 109 | |
| journal lastpage | 117 | |
| identifier eissn | 1528-8978 | |
| keywords | Inspection | |
| keywords | Boilers | |
| keywords | Probability AND Sampling (Acoustical engineering) | |
| tree | Journal of Pressure Vessel Technology:;2007:;volume( 129 ):;issue: 001 | |