Show simple item record

contributor authorGuy Roussel
contributor authorLeon Cizelj
date accessioned2017-05-09T00:25:35Z
date available2017-05-09T00:25:35Z
date copyrightFebruary, 2007
date issued2007
identifier issn0094-9930
identifier otherJPVTAS-28476#109_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/136744
description abstractThe basis for determining the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after no defective tubes have been detected in the randomly selected inspection sample is proposed. A Bayesian estimation is used to obtain closed-form solutions for uniform, triangular, and binomial prior densities describing the number of failed tubes in steam generators. It is shown that the particular way of selecting the random inspection sample (e.g., one sample from both SG, one sample from each SG, etc.) does not affect the results of the inspection and also the information obtained about the state of the uninspected tubing, as long as the inspected steam generators belong to the same population. Numerical examples further demonstrate two possible states of the knowledge existing before the inspection of the tubing. First, virtually no knowledge about the state of the steam generator tubing before the inspection is modeled using uniform and triangular prior densities. It is shown that the knowledge about the uninspected part of the tubing strongly depends on the size of the sample inspected. Further, even small inspection samples may significantly improve our knowledge about the uninspected part. On the other hand, rather strong belief on the state of the tubing prior to the inspection is modeled using binomial prior density. In this case, the knowledge about the uninspected part of the tubing is virtually independent on the size of the sample. Furthermore, it is shown qualitatively and quantitatively that such inspection brings no additional knowledge on the uninspected part of the tubing.
publisherThe American Society of Mechanical Engineers (ASME)
titleReliability of Sampling Inspection Schemes Applied to Replacement Steam Generators
typeJournal Paper
journal volume129
journal issue1
journal titleJournal of Pressure Vessel Technology
identifier doi10.1115/1.2389027
journal fristpage109
journal lastpage117
identifier eissn1528-8978
keywordsInspection
keywordsBoilers
keywordsProbability AND Sampling (Acoustical engineering)
treeJournal of Pressure Vessel Technology:;2007:;volume( 129 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record