YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Low Cost Capacity For Peaking Generation

    Source: Journal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001::page 11
    Author:
    E. S. Miliaras
    DOI: 10.1115/1.3609126
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: A means of obtaining peaking generation from existing generating units is proposed, by installing lower steam temperature boiler capacity in parallel with the existing boiler; the additional steam bypassing the high pressure turbine and the reheater into the intermediate pressure turbine. The economics compare very favorably to the available methods of obtaining peaking generation. Future peaking capability built into baseload units is also considered.
    keyword(s): Pressure , Temperature , High pressure (Physics) , Boilers , Economics , Turbines AND Steam ,
    • Download: (1.565Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Low Cost Capacity For Peaking Generation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/126201
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorE. S. Miliaras
    date accessioned2017-05-09T00:06:31Z
    date available2017-05-09T00:06:31Z
    date copyrightJanuary, 1968
    date issued1968
    identifier issn1528-8919
    identifier otherJETPEZ-26667#11_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/126201
    description abstractA means of obtaining peaking generation from existing generating units is proposed, by installing lower steam temperature boiler capacity in parallel with the existing boiler; the additional steam bypassing the high pressure turbine and the reheater into the intermediate pressure turbine. The economics compare very favorably to the available methods of obtaining peaking generation. Future peaking capability built into baseload units is also considered.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleLow Cost Capacity For Peaking Generation
    typeJournal Paper
    journal volume90
    journal issue1
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.3609126
    journal fristpage11
    journal lastpage14
    identifier eissn0742-4795
    keywordsPressure
    keywordsTemperature
    keywordsHigh pressure (Physics)
    keywordsBoilers
    keywordsEconomics
    keywordsTurbines AND Steam
    treeJournal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian