description abstractA means of obtaining peaking generation from existing generating units is proposed, by installing lower steam temperature boiler capacity in parallel with the existing boiler; the additional steam bypassing the high pressure turbine and the reheater into the intermediate pressure turbine. The economics compare very favorably to the available methods of obtaining peaking generation. Future peaking capability built into baseload units is also considered.
publisherThe American Society of Mechanical Engineers (ASME)
titleLow Cost Capacity For Peaking Generation
typeJournal Paper
journal volume90
journal issue1
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.3609126
journal fristpage11
journal lastpage14
identifier eissn0742-4795
keywordsPressure
keywordsTemperature
keywordsHigh pressure (Physics)
keywordsBoilers
keywordsEconomics
keywordsTurbines AND Steam
treeJournal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record