| description abstract | A means of obtaining peaking generation from existing generating units is proposed, by installing lower steam temperature boiler capacity in parallel with the existing boiler; the additional steam bypassing the high pressure turbine and the reheater into the intermediate pressure turbine. The economics compare very favorably to the available methods of obtaining peaking generation. Future peaking capability built into baseload units is also considered. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Low Cost Capacity For Peaking Generation | |
| type | Journal Paper | |
| journal volume | 90 | |
| journal issue | 1 | |
| journal title | Journal of Engineering for Gas Turbines and Power | |
| identifier doi | 10.1115/1.3609126 | |
| journal fristpage | 11 | |
| journal lastpage | 14 | |
| identifier eissn | 0742-4795 | |
| keywords | Pressure | |
| keywords | Temperature | |
| keywords | High pressure (Physics) | |
| keywords | Boilers | |
| keywords | Economics | |
| keywords | Turbines AND Steam | |
| tree | Journal of Engineering for Gas Turbines and Power:;1968:;volume( 090 ):;issue: 001 | |