YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Manufacturing Science and Engineering
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Manufacturing Science and Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Machining Cost Optimization Involving Shift and Overtime Work

    Source: Journal of Manufacturing Science and Engineering:;2000:;volume( 122 ):;issue: 004::page 790
    Author:
    Esko Niemi
    DOI: 10.1115/1.1314600
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Minimization of machining cost as a function of cutting speed is examined taking into account the effect of shift and overtime work. The cost minimization problem is formulated as the minimization of the total cost of machining a given number of workpieces within a given time. Different types of costs of machining and determination of cost parameters in the long run and short run are discussed. The use of both one-tool type and several-tool types is considered. Characteristics of the solutions of the problem are examined in light of examples. [S1087-1357(00)02304-2]
    keyword(s): Machining , Optimization AND Cutting ,
    • Download: (108.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Machining Cost Optimization Involving Shift and Overtime Work

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/123958
    Collections
    • Journal of Manufacturing Science and Engineering

    Show full item record

    contributor authorEsko Niemi
    date accessioned2017-05-09T00:02:51Z
    date available2017-05-09T00:02:51Z
    date copyrightNovember, 2000
    date issued2000
    identifier issn1087-1357
    identifier otherJMSEFK-27431#790_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/123958
    description abstractMinimization of machining cost as a function of cutting speed is examined taking into account the effect of shift and overtime work. The cost minimization problem is formulated as the minimization of the total cost of machining a given number of workpieces within a given time. Different types of costs of machining and determination of cost parameters in the long run and short run are discussed. The use of both one-tool type and several-tool types is considered. Characteristics of the solutions of the problem are examined in light of examples. [S1087-1357(00)02304-2]
    publisherThe American Society of Mechanical Engineers (ASME)
    titleMachining Cost Optimization Involving Shift and Overtime Work
    typeJournal Paper
    journal volume122
    journal issue4
    journal titleJournal of Manufacturing Science and Engineering
    identifier doi10.1115/1.1314600
    journal fristpage790
    journal lastpage794
    identifier eissn1528-8935
    keywordsMachining
    keywordsOptimization AND Cutting
    treeJournal of Manufacturing Science and Engineering:;2000:;volume( 122 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian