Show simple item record

contributor authorEsko Niemi
date accessioned2017-05-09T00:02:51Z
date available2017-05-09T00:02:51Z
date copyrightNovember, 2000
date issued2000
identifier issn1087-1357
identifier otherJMSEFK-27431#790_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/123958
description abstractMinimization of machining cost as a function of cutting speed is examined taking into account the effect of shift and overtime work. The cost minimization problem is formulated as the minimization of the total cost of machining a given number of workpieces within a given time. Different types of costs of machining and determination of cost parameters in the long run and short run are discussed. The use of both one-tool type and several-tool types is considered. Characteristics of the solutions of the problem are examined in light of examples. [S1087-1357(00)02304-2]
publisherThe American Society of Mechanical Engineers (ASME)
titleMachining Cost Optimization Involving Shift and Overtime Work
typeJournal Paper
journal volume122
journal issue4
journal titleJournal of Manufacturing Science and Engineering
identifier doi10.1115/1.1314600
journal fristpage790
journal lastpage794
identifier eissn1528-8935
keywordsMachining
keywordsOptimization AND Cutting
treeJournal of Manufacturing Science and Engineering:;2000:;volume( 122 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record