Search
Now showing items 1-8 of 8
Closure to “<i>Public‐Safety Issues in Collapse of L'Ambiance Plaza</i>” by Frank J. Heger (May, 1991, Vol. 5, No. 2)
Publisher: American Society of Civil Engineers
Public Safety—Is It Compromised by New LRFD Design Standards?
Publisher: American Society of Civil Engineers
Abstract: Factors of safety for flexural members designed using the ASCE 7‐88 and American Institute of Steel Construction (AISC) LRFD 1986 standards are investigated and found to represent a significant reduction in reliability ...
Public‐Safety Issues in Collapse of L'Ambiance Plaza
Publisher: American Society of Civil Engineers
Abstract: Investigations of the collapse of the partially completed L'Ambiance Plaza, a 16‐story residential project under construction in Bridgeport, Connecticut, revealed four major structural deficiencies that may have triggered ...
Assurance of Structural Safety—Priority Issue for Structural Engineers
Publisher: American Society of Civil Engineers
Abstract: Assurance of structural safety should always be a key project goal. However, a number of impediments have arisen that work against the uniform achievement of this objective in current American practices for building design ...
Closure to “Public Safety—Is It Compromised by New LRFD Design Standards?” by Frank J. Heger
Publisher: American Society of Civil Engineers
Discussion: Calibration of Current Factors in LRFD for Steel
Publisher: American Society of Civil Engineers
Limit‐States Design of Prestressed Concrete Pipe. I: Criteria
Publisher: American Society of Civil Engineers
Abstract: A new design procedure is presented for prestressed concrete cylinder pipe subjected to internal pressure, external loads, and pipe and fluid weights based on certain limit‐states design criteria. The proposed design ...
Experimental Evaluation of Design Methods for Prestressed Concrete Plpe
Publisher: American Society of Civil Engineers
Abstract: Tests conducted by the prestressed concrete pressure pipe industry in the United States during the past four decades have been gathered and analyzed. The present industry design procedures are summarized. Test results are ...
CSV
RIS