Show simple item record

dc.contributor.authorP. S. Koelle
dc.date.accessioned2017-05-08T23:13:06Z
dc.date.available2017-05-08T23:13:06Z
dc.date.copyrightJune, 1982
dc.date.issued1982
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26386#186_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/95703
dc.description.abstractLoop testing of safety devices during operation improves plant performance, reduces downtime of process-dependent rotating equipment, and enhances training of personnel. Designers, manufacturers, staff engineers, and plant personnel are always concerned with improving the efficiency and reliability of process equipment. An unscheduled shutdown caused by breakdowns or accidents involving machinery may result in millions of dollars in unrecoverable losses, because the capacity of rotating equipment has increased to a point where temporary replacements to enable the plants to continue their production are hard, or even impossible, to find. The paper will discuss how accidents may be prevented and outline a systematic approach to checking alarm and trip circuits.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleMissed Opportunities—Strategy and Procedures for Testing Alarm and Shutdown Devices
dc.typeJournal Paper
dc.journal.volume104
dc.journal.issue2
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.3230398
dc.journal.fristpage186
dc.journal.lastpage190
dc.identifier.eissn1528-8994
dc.keywordsTesting
dc.keywordsIndustrial plants
dc.keywordsAccidents
dc.keywordsPlant personnel
dc.keywordsCircuits
dc.keywordsMachinery
dc.keywordsSafety
dc.keywordsEngineers
dc.keywordsReliability
dc.keywordsBreakdown (Electricity) AND Downtime
dc.treeJournal of Energy Resources Technology:;1982:;volume( 104 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record