• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Missed Opportunities—Strategy and Procedures for Testing Alarm and Shutdown Devices

    Thumbnail
    View/Open
    JERTD2-26386#186_1.pdf (467.9Kb)
    Date
    1982
    Author
    P. S. Koelle
    Metadata
    Show full item record
    Abstract
    Loop testing of safety devices during operation improves plant performance, reduces downtime of process-dependent rotating equipment, and enhances training of personnel. Designers, manufacturers, staff engineers, and plant personnel are always concerned with improving the efficiency and reliability of process equipment. An unscheduled shutdown caused by breakdowns or accidents involving machinery may result in millions of dollars in unrecoverable losses, because the capacity of rotating equipment has increased to a point where temporary replacements to enable the plants to continue their production are hard, or even impossible, to find. The paper will discuss how accidents may be prevented and outline a systematic approach to checking alarm and trip circuits.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/95703
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV