• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Potential Advantages to Water Jet Drilling for Use in In-Situ Coal Gasification Processes

    Thumbnail
    View/Open
    JERTD2-26382#147_1.pdf (3.476Mb)
    Date
    1981
    Author
    D. A. Summers
    C. R. Barker
    Metadata
    Show full item record
    Abstract
    Current methods of in-situ gasification require that inter-well connection be by means of either reverse combustion burning or by directional drilling. High-pressure water jet drills concentrate the energy of cutting in a small area and the total thrust required to advance this system is thus minimized. This has been used advantageously to develop a drill for coal seams which can be lowered down a vertical well turned through a 90-deg angle and then advanced horizontally through the coal. A test unit operating at a pressure of 70 MPa and a flow rate of 90 L/min has been used to demonstrate, in a surface trial, the practicality of this concept for interconnecting two in-situ gasification wells located 20 m apart.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/94433
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV