Show simple item record

dc.contributor.authorAjibade Aibinu
dc.contributor.authorSudha Venkatesh
dc.date.accessioned2017-05-08T22:07:33Z
dc.date.available2017-05-08T22:07:33Z
dc.date.copyrightJuly 2014
dc.date.issued2014
dc.identifier.other30010821.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/71840
dc.description.abstractThere is anecdotal evidence that the adoption of building information modeling (BIM) is on the increase. However, the extent to which quantity surveyors (QS) (also referred to as cost consultants or cost engineers) are now using BIM features is not clear. The research reported in this paper was aimed at understanding the BIM experience of QS firms and cost consultants in Australia as well as to understand the progress they have made towards the use of BIM features. Data collection was a web-based survey of 180 QS firms with 40 responses and two in-depth interviews. Findings from the study show that BIM features are not readily used by QS firms owing to uncertainties concerning the integrity of three-dimensional (3D) models issued by designers, incomplete information in models, lack of knowledge concerning new business processes to drive the use of BIM use, lack of demand by clients, cost of implementing BIM features within the existing practice and learning time required to adopt BIM features. It appears that most of the firms have experience in computer aided take-off with two-dimensional (2D) drawing in the project’s front end tasks such as cost planning and bill of quantities. Most of them have little experience with automated extraction of quantities using 3D models. Only one experience the use of BIM features in contract administration duties. 3D computer-aided drawing (CAD) drawings are used only for visualization. In many BIM-based projects reported, cost consultants were not issued the 3D BIM developed by designers; instead, 2D drawings were issued to the QS for quantity take-off and cost estimation. In cases where automatic quantity extraction was performed using 3D models, there seems to be lack of clarity concerning the
dc.publisherAmerican Society of Civil Engineers
dc.titleStatus of BIM Adoption and the BIM Experience of Cost Consultants in Australia
dc.typeJournal Paper
dc.journal.volume140
dc.journal.issue3
dc.journal.titleJournal of Professional Issues in Engineering Education and Practice
dc.identifier.doi10.1061/(ASCE)EI.1943-5541.0000193
dc.treeJournal of Professional Issues in Engineering Education and Practice:;2014:;Volume ( 140 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record