• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Professional Issues in Engineering Education and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia

    Thumbnail
    View/Open
    30010821.pdf (600.1Kb)
    Date
    2014
    Author
    Ajibade Aibinu
    Sudha Venkatesh
    Metadata
    Show full item record
    Abstract
    There is anecdotal evidence that the adoption of building information modeling (BIM) is on the increase. However, the extent to which quantity surveyors (QS) (also referred to as cost consultants or cost engineers) are now using BIM features is not clear. The research reported in this paper was aimed at understanding the BIM experience of QS firms and cost consultants in Australia as well as to understand the progress they have made towards the use of BIM features. Data collection was a web-based survey of 180 QS firms with 40 responses and two in-depth interviews. Findings from the study show that BIM features are not readily used by QS firms owing to uncertainties concerning the integrity of three-dimensional (3D) models issued by designers, incomplete information in models, lack of knowledge concerning new business processes to drive the use of BIM use, lack of demand by clients, cost of implementing BIM features within the existing practice and learning time required to adopt BIM features. It appears that most of the firms have experience in computer aided take-off with two-dimensional (2D) drawing in the project’s front end tasks such as cost planning and bill of quantities. Most of them have little experience with automated extraction of quantities using 3D models. Only one experience the use of BIM features in contract administration duties. 3D computer-aided drawing (CAD) drawings are used only for visualization. In many BIM-based projects reported, cost consultants were not issued the 3D BIM developed by designers; instead, 2D drawings were issued to the QS for quantity take-off and cost estimation. In cases where automatic quantity extraction was performed using 3D models, there seems to be lack of clarity concerning the
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/71840
    Collections
    • Journal of Professional Issues in Engineering Education and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV