• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Composites for Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Composites for Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Front and Side View Image Correlation Measurements on FRP to Concrete Pull-Off Bond Tests

    Thumbnail
    View/Open
    %28asce%29cc%2E1943-5614%2E0000109.pdf (1.585Mb)
    Date
    2010
    Author
    Christoph Czaderski
    Khaled Soudki
    Masoud Motavalli
    Metadata
    Show full item record
    Abstract
    Understanding the transfer of force by bond between externally bonded fiber-reinforced polymer (FRP) reinforcement and concrete is an important step in formulating good models for predicting debonding failures observed in externally bonded reinforcement strengthened systems. In this paper, a 3D optical displacement measurement system was used to capture the full-field displacements from the front and side view in pull-off bond specimens. The experiments were carried using six specimens with carbon FRP (CFRP) strips having different axial stiffnesses but a constant bond length to the concrete substrate. Using the optical measurements, it was possible to obtain the in-plane displacement or slip and the out-of-plane displacement or separation between the CFRP strip and the concrete. It was demonstrated, that the usual assumption of pure shear stresses in such pull-off tests is not true and that the bond behavior is a two-dimensional problem involving shear and peeling stresses. The bond behavior in CFRP strip to concrete pull-off tests was characterized by three stages: (1) the initiation of the first crack; (2) the initiation of debonding; and (3) failure by complete debonding. Based on the test results it was found that there was a dependency between the maximum bond shear stress, the maximum fracture energy of the FRP-concrete interface, and the stiffness of the FRP. However, the slip values after initiation of debonding (Stage 2) were independent of the FRP stiffness. The measured anchorage force and anchorage length were in good agreement with predictions from existing code equations.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/57222
    Collections
    • Journal of Composites for Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV